AliDeck Balcony Drainage System for a positively-drained to pipe outlet wastewater management solution on balconies
The AliDeck Balcony Drainage System is a piped drainage solution for balconies, designed to effectively capture and channel rainwater and spillages to reduce the risk of liquids falling onto passers-by or lower balconies underneath, answering the concerns raised by Building Control organisations, in BS8579:2020 (Guide to the design of balconies and terraces), and more.
With the original AliDeck Drainage Channel sited between AliDeck Decking Boards, wastewater is directed to the ends of the balcony where it is captured by the AliDeck Drainage Gutter and fed to a down-pipe or area of your choice. Designed to cope with adverse weather conditions, the AliDeck Balcony Drainage System is the UK’s only decking-level complete balcony drainage system, eliminating the need for water trays in the balcony soffit.
This innovative complete Drainage System from AliDeck is a direct result of our commitment to continually evolve and refine our range of products to always meet the needs and requirements of our customers and the industry. Available in a range of sizes to suit all requirements, the AliDeck Balcony Drainage System solves the increasingly pressing concern of how to correctly drain balconies.
To find out more about the AliDeck Balcony Drainage System, please read on or call the team on 01622 235 672.
The Full Range of components of the AliDeck Balcony Drainage System for Project Success
The AliDeck Balcony Drainage System has been carefully designed to meet the requirements of balcony manufacturers, steel fabricators, main contractors, architects, specifiers, and more. Our approach to working with our customers is based around the principle of achieving project success on balcony, terrace and walkway projects and we have developed both our products and the way we provide our service to facilitate this.
From the first point of contact through to delivery of material and beyond, the AliDeck team is committed to doing all that we can to guarantee the right outcome for your project.
Take a look at some recent case studies where AliDeck was used to achieve project success.
AliDeck & IET Savoy Double-Page Feature in Architecture, Building, Contracting & Developing Magazine
AliDeck Features a Double Page Article in Architecture, Building, Contracting & Developing Magazine
AliDeck Visits Structural Architectural Steelwork Specialists Barretts of Aspley Balcony
At AliDeck, we understand the critical role that our customers play in our success story.
Balcony Fire Remediation Project Curved Terraces Walkways Horizon Poole
Balcony Fire Remediation Project with curved terraces and walkways at Horizons assisted living