AliDeck Supply Alu-Installations with Aluminium Decking Solutions for Remediation Project at The Uncommon, London
AliDeck supplied high-quality aluminium decking products, including our Junior Flat Boards, Eco 30 and Eco 50 Joists, and Adjustable Pedestals, for an extensive terrace and walkway project at The Uncommon in London, near St Paul’s Cathedral. In collaboration with Alu Installations Ltd, this project aimed to create a safe and aesthetically pleasing outdoor spaces while achieving compliance with BS 8579:2020 standards.
The project involved installing aluminium decking on multiple terraces and walkways. The installation needed to accommodate structural requirements and ensure durability while enhancing the building’s visual appeal.
We specified the following high-quality products to ensure longevity and performance:
- Junior Flat Board: Durable, non-slip, fire-resistant, low-maintenance, ideal for all decking projects
- Eco 30 Joist: 30mm profile, versatile, 600mm span, lightweight, cost-effective, easy to install
- Eco 50 Joist: 50mm profile, 1000mm span, excellent strength, cost-effective an east to install
- Adjustable Pedestal with Carrier: 200mm-275mm with 100mm Cradle offers versatile solution to achieve consistent build-up height
These products form a comprehensive system, streamlining specification and achieving required build-up heights efficiently. All of our products benefit from a high-quality finish through our in-house seven-stage pre-treatment powder-coating facility, adhering to Qualicoat Seaside standards which is far above the industry standard, enhancing durability and aesthetic appeal.
Partnership with Alu Installations Ltd
Our collaboration with Alu Installations Ltd, a trusted AliDeck Approved-Installer, was key to the project success achieved at The Uncommon. Their expertise ensured precise installation and alignment of the decking system. Mike Beckett, AliDeck Technical Sales Manager, supported the project with technical guidance.
- Quality Assurance: Conducted thorough inspections to ensure superior results.
- Technical Support: Ongoing guidance from Mike Beckett, AliDeck Technical Sales Manager, ensured project success.
- Efficient Coordination: Streamlined communication and collaboration led to timely completion and high client satisfaction.
These products form a comprehensive system, streamlining specification and achieving required build-up heights efficiently. All of our products benefit from a high-quality finish through our in-house seven-stage pre-treatment powder-coating facility, adhering to Qualicoat Seaside standards which is far above the industry standard, enhancing durability and aesthetic appeal.
Futureproofing in Line with BS 8579:2020
The project was futureproofed to comply with BS 8579:2020, ensuring safe, cost-effective solutions for external balconies and terraces.
The final decking installation exceeded expectations, blending functionality and elegance, perfect for relaxation and business activities. The robust materials ensure durability while enhancing the building’s aesthetic.
For more information on how we support our Approved Installers create project success across their balcony, walkway and terrace projects, contact us on 01622 235 672 or email us via info@alideck.co.uk.