AliDeck’s Commitment to Remediation in 2024 and Beyond: Innovative Fire-Safe Solutions
AliDeck is at the forefront of innovation and compliance, ensuring our fire-safe design solutions not only meet but exceed the upcoming building regulations. Our proactive approach is driven by a commitment to safety, sustainability, and excellence, ensuring that our clients are always one step ahead.
Innovations in Fire-Safe Materials and Design
Research and Development: Our ongoing investment in R&D through 3D Renders, animations, and print, along with regular in-house product testing has enabled us to pioneer the use of fire-safe materials specifically for balconies, terraces, and walkways, while establishing new benchmarks for the industry through product innovation.
Design Excellence: We integrate the latest fire safety technologies into our designs, offering unmatched protection and reassurance for outdoor living spaces.
Sustainability: Focusing on eco-friendly, fire-resistant materials, we ensure our balcony, terrace, and walkway solutions are safe for both people and the planet.
Staying Ahead of Compliance: British Standards and Building Regulations
Regulatory Monitoring: We stay informed of all regulatory changes, anticipating future compliance needs for outdoor residential and commercial spaces.
Collaboration: By working closely with regulatory bodies and industry experts, we adapt to and influence new standards, ensuring our balcony and terrace solutions lead the market.
Education: We keep our clients and partners informed with the latest compliance and safety standards, ensuring they are always ahead of the curve.
Case Studies: A Comprehensive Guide to Creating Project Success with AliDeck
Innovative Residential Complex: Featuring our latest fire-safe decking solutions, this residential project at Ashby’s Point in Tonbridge, Kent, is now designed to surpass 2024 safety standards, showcasing our commitment to the future of balcony and terrace safety.
Commercial Retrofit: Demonstrating our dedication to upgrading existing structures, the roof terrace decking area at the iconic Savoy Place in London has been fully refurbished with our cost-effective and non-combustible materials, as seen below, emphasising our pledge to safety and compliance.
In 2024 and beyond, we will continue our endeavour to proactively support a fire-safe future across key areas within the construction industry. Our dedication to innovation, compliance, and safety ensures that our partners and clients are always equipped with the best solutions on the market.
Ready to future-proof your project with AliDeck’s fire-safe solutions? Contact us today on 01622 235 672 or email info@alideck.co.uk to learn more about our commitment to safety and compliance for 2024 and beyond.